Case Study: River House Project

Mr Clarke replaced his gas boiler with a Kensa 24kW Single Phase Twin Compressor to harness heat energy from a nearby lake to provide space heating and domestic hot water (DHW) to his Grade 2 listed farmhouse.

Key facts:

Credits: Pond mat photos courtesy of Total Renewable Solutions
Share Button