Ground Source Heat Pump Timelapse In Tower Blocks – Phase 2

Kensa Contracting and ENGIE retrofitting Kensa Shoebox ground source heat pumps into eight tower blocks in the London borough of Enfield.

This timelapse video shows the borehole drilling for a second tower block, which will form part of the decentralised heat pump system (an individual Kensa ground source heat pump in each flat) fed by a shared ground loop.

Follow the project at www.kensaheatpumps.com/enfield

Share Button

Related Content

Videos: From Space – England’s Largest District Ground Source Heat Pump System

England’s largest district ground source heat pump scheme is visible from space! See two of the eight tower blocks that have been retrofitted with Kensa Shoebox heat pumps connected to shared ground loop arrays by Kensa Contracting. Google Earth has captured the moment the borehole ground arrays had been installed with the ground recovery in progress,…


News: Kensa Launches ‘How To’ Guide To Heat Pumps In Tower Blocks

A new animation produced by Kensa Heat Pumps aims to educate the owners and developers of the tens of thousands of high rise flats in the UK to the solution posed by retrofitting district ground source heat pumps.


News: England’s Largest District Ground Source System Breaks New Ground

The UK’s pioneer of domestic district ground source heat pump systems, Kensa Contracting, has secured the contract to deliver England’s largest shared ground loop array heat pump system with ENGIE.