READ THE FULL STORY AT KENSACONTRACTING.COM


 

  • To date, 1025.09t CO2e has been saved by these ground source heat pump installations, accelerating NCC towards its 2030 carbon-neutral target.
  • Six more ground source heat pump projects will become operational in 2022 in NCC buildings, funded by the Public Sector Decarbonisation Scheme (PSDS).

READ THE FULL STORY AT KENSACONTRACTING.COM

Share Button