England’s largest district ground source heat pump scheme is visible from space!
See two of the eight tower blocks that have been retrofitted with Kensa Shoebox heat pumps connected to shared ground loop arrays by Kensa Contracting.
Google Earth has captured the moment the borehole ground arrays had been installed with the ground recovery in progress, just prior to being re-turfed; view before and after shots of this ground-breaking ground source heat pump project!